People perform dragon dance at a delivery ceremony of Haikui No. 1, Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility, in Qingdao, east China's Shandong Province, April 26, 2024. Designed and built by China, Haikui No. 1 was completed and delivered in Qingdao on Friday.
With a maximum displacement of 100,000 tons and storage capacity of 60,000 tons of oil, the facility is capable of operating for 15 years at sea without returning to dock. (Xinhua/Li Ziheng)
A delivery ceremony of Haikui No. 1, Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility, is held in Qingdao, east China's Shandong Province, April 26, 2024. Designed and built by China, Haikui No. 1 was completed and delivered in Qingdao on Friday.
With a maximum displacement of 100,000 tons and storage capacity of 60,000 tons of oil, the facility is capable of operating for 15 years at sea without returning to dock. (Photo by Zhang Jingang/Xinhua)
An aerial drone photo taken on April 26, 2024 shows Haikui No. 1, Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility, in Qingdao, east China's Shandong Province. Designed and built by China, Haikui No. 1 was completed and delivered in Qingdao on Friday.
With a maximum displacement of 100,000 tons and storage capacity of 60,000 tons of oil, the facility is capable of operating for 15 years at sea without returning to dock. (Xinhua/Li Ziheng)
(Editor:Wang Su)
Embassy welcomes 'home' overseas Chinese
Unable to get on a WNBA roster, ex
Mississippi lawmakers expected to vote on Medicaid expansion plan with work requirement
Jofra Archer picked by England for T20 World Cup after cruel run of injuries
Xi affirms nation's commitment to future of humanity
Man United's ENTIRE squad 'is up for sale'
Afghanistan's Taliban woos foreign tourists
Mitch Garver's home run in the 9th inning gives Mariners a 2